Date of Outage | 14-12-2023 |
Town | Sornavur |
Substation | SORNAVUR |
Feeder | SORNAVUR |
Location | sornavur,Mettupalayam,Sorappur, Krishnapuram and near by places |
Type of work | 1)22 KV Bus bar clamp tightness to be checked . 2) All CT, Breaker and AB switch clamps Bolt & Nut tightness to be checked and Jumper Renewal work 3) Power Transformer bushing cleaning and clamps tigh |
From Date | 14-12-2023 09:00 |
To Date | 14-12-2023 02:00 |
Date of Outage | 16-12-2023 |
Town | sittampoondy |
Substation | SITTAMPOONDY 110/33 KV SS |
Feeder | SITTAMPOONDY 110/33 KV SS |
Location | sittam poondy and near by placces |
Type of work | a) Meggering of all equipment’s. b) Tightness of all Bolts & Nuts to be Checked. c) Maintenance of Power Transformers to be attended. d) HT line maintenance & tree clearance. e) Replacement of lower s |
From Date | 16-12-2023 09:00 |
To Date | 16-12-2023 04:00 |
Date of Outage | 16-12-2023 |
Town | Murukery |
Substation | MURUKKERY |
Feeder | MURUKKERY |
Location | Brammadesam,Murukery,marakkanam, Anumandai,avanipur |
Type of work | 1. All the Power Transformer cleaning and HV, LV bushes tightness checking work, 2.Conversion switches jumper renewal work. 3.Tree clearance work to be carried to all 33 kv & 11Kv feeders |
From Date | 16-12-2023 09:00 |
To Date | 16-12-2023 04:00 |
Date of Outage | 16-12-2023 |
Town | marakkanam |
Substation | MARAKKANAM 110/33-11 KV SS |
Feeder | MARAKKANAM 110/33-11 KV SS |
Location | Marakkanam,Vadaagragaram,muttukadu, Achikadu and near by areas |
Type of work | 1. All the Power Transformer cleaning and HV, LV bushes tightness checking work, 2.Conversion switches jumper renewal work. 3.Tree clearance work to be carried to all 33 kv & 11Kv feeders |
From Date | 16-12-2023 09:00 |
To Date | 16-12-2023 04:00 |
Date of Outage | 16-12-2023 |
Town | Gingee |
Substation | GINGEE 110 KV |
Feeder | GINGEE 110 KV |
Location | a) Meggering of all equipment’s and Earth pit value b)Tightness of all Bolts & Nuts to be Checked. c)Maintenance of Power Transformers to be attend. d)Maintenance of all isolators and AB Switches to b |
Type of work | 1. All the Power Transformer cleaning and HV, LV bushes tightness checking work, 2.Conversion switches jumper renewal work. 3.Tree clearance work to be carried to all 33 kv & 11Kv feeders |
From Date | 16-12-2023 09:00 |
To Date | 16-12-2023 04:00 |
Date of Outage | 19-12-2023 |
Town | Madurapakkam |
Substation | MADURAPAKKAM 110 KV |
Feeder | MADURAPAKKAM 110 KV |
Location | Nerkunam,Sengadu,Panayapuram, Radhapuram and near by places |
Type of work | Insulation meggering of all the breakers, CT’s and Power Transformers. 2. Cleaning of all the bushings, Petticoats of the limbs and applying petroleum jelly after checking the tightness. 3. The replac |
From Date | 19-12-2023 09:00 |
To Date | 19-12-2023 02:00 |
Date of Outage | 20-12-2023 |
Town | vikkaravandi |
Substation | VIKARAVANDI 110 KV |
Feeder | VIKARAVANDI 110 KV |
Location | Vikkaravandi,Asoor,MundiyampakkamReddikuppam and near by places |
Type of work | 1) Insulation meggering of all the breakers, CT’s and Power Transformers. 2) Cleaning of all the bushings, Petticoats of the limbs and applying petroleum jelly after checking the tightness. 3) Checkin |
From Date | 20-12-2023 09:00 |
To Date | 20-12-2023 04:00 |
Date of Outage | 21-12-2023 |
Town | Thayanur |
Substation | THAYANUR |
Feeder | THAYANUR |
Location | thayanur,melmalayanur,Manandal,Vadapalai ,Eyyakunam,Kodukkankuppam and near by places |
Type of work | a) Power Transformer Oil top up & Oil leakage to be arrest b) Meggering of all equipment’s. c) Tightness of all Bolts & Nuts to be Checked. d) Maintenance of Power Transformers to be attend. e)Mainten |
From Date | 21-12-2023 09:00 |
To Date | 21-12-2023 04:00 |
Date of Outage | 21-12-2023 |
Town | Kedar |
Substation | KEDAR 110/22 KV SS |
Feeder | KEDAR 110/22 KV SS |
Location | Malligaipattu,Vazhapattu, Venganthur,Porur and near by places |
Type of work | Insulator meggering of all the breakers CT ‘S and power Transformer 2) Clearing of all the bushing petticoats of the Limbs and applying petroleum jelly after Checking the tightness. 3) Checking of Rur |
From Date | 21-12-2023 09:00 |
To Date | 21-12-2023 04:00 |
Date of Outage | 28-12-2023 |
Town | Elamangalam |
Substation | ELAMANGALAM 110 KV |
Feeder | ELAMANGALAM 110 KV |
Location | Elamangalam,Kattusiviri, puliyanur,Melolakkur, Kattanjimedu,rettanaivadasiruvalur, Keelpapambadi |
Type of work | Maintenance Work |
From Date | 28-12-2023 09:00 |
To Date | 28-12-2023 04:00 |
Date of Outage | 28-12-2023 |
Town | Gingee |
Substation | GINGEE 110 KV |
Feeder | GINGEE 110 KV |
Location | gingee town,sirunampoondy, perungapur,Thorapadi, Perumpoondy, Maniumpattu and near by places |
Type of work | Mggering of all equipments and earth pit value, Tightness of all bolt & Nuts to be checked, Maintenance of Power transformer,Isolators ,in power trans former III oil temperature alaram calibration sett |
From Date | 28-12-2023 09:00 |
To Date | 28-12-2023 04:00 |
Date of Outage | 28-12-2023 |
Town | sittampoondy |
Substation | SITTAMPOONDY 110/33 KV SS |
Feeder | SITTAMPOONDY 110/33 KV SS |
Location | melkudalore ,Mattaparai, AthiyurM.Pudur,Ananthapuram thandavasamuthiram |
Type of work | Mggering of all equipments and tightness of all bolt & Nuts to be cheked Maintenance of power transformer , Isolators, AB switches, replaceement of lower size conductor by 7/4.09 in Melkudalur feeder,HT |
From Date | 28-12-2023 09:00 |
To Date | 28-12-2023 04:00 |
Date of Outage | 30-12-2023 |
Town | Tindivanam |
Substation | TINDIVANAM 110 KV |
Feeder | TINDIVANAM 110 KV |
Location | Tindivanam,Kiliyanur,uppuvellur saram, ural and near by areas |
Type of work | 1. Tightness to be checked in 33 & 11 KV line and Bus side AB switches and Conversion switches 2. To replace the worn-out Bolt& Nuts in all 11 KV Feeders &33 KV Feeders. 3. To check the tightness of i |
From Date | 30-12-2023 09:00 |
To Date | 30-12-2023 04:00 |